1 SELECT OBJECT

2 SELECT A SERVICE

3 YOU CHOOSE

  • Object:
  • Service:

4 Cost and terms

  • Minimum cost

  • Average typical cost

  • Current Max Cost

  • Minimum work time

  • Average typical term of works

  • Current maximum work time

1

Almost instant result

2

Selection and determination of the appropriate solution together with the client

3

Only top equipment and tools

4

The possibility of phased implementation of the project in accordance with the client's SCHEDULE

5

Post-project monitoring and promptness in case of necessary improvements. Communication 24/7

6

Parallel improvement of the characteristics of hydraulic, heat and vibration insulation of structures

IN ANY SITUATION, IT IS IMPORTANT TO CONSCIOUSLY ASSESS THE RISKS OF RESOLUTION OR INACTION WITH A CONSTRUCTION EXPERT

AUTO CENTER IN KYIV carcenter

AUTO CENTER IN KYIV

  • Target:

    Soils stabilization in foundations base

  • Location:

    Kyiv, Ukraine

  • Technology:

    Deep Lifting

  • Year:

    2016

FOOD FACTORY PRODUCTION DEPARTMENT IN KYIV REGION vyrobnychyj-czeh-harchovoyi-fabryky-v-kyyivskij-oblasti

FOOD FACTORY PRODUCTION DEPARTMENT IN KYIV REGION

  • Target:

    Soils stabilization at the foundations base of the production building

  • Location:

    Kyiv, Ukraine

  • Technology:

    Deep Lifting

  • Year:

    2018

RESIDENTIAL BUILDING IN OBOLONSKYI DISTRICT OF KYIV Vikonannya_robit_zi_stabilizaciyi_gruntu_zhitlovogo_budinku

RESIDENTIAL BUILDING IN OBOLONSKYI DISTRICT OF KYIV

  • Target:

    Soils stabilization at the foundation base

  • Location:

    Kyiv, Ukraine

  • Technology:

    Deep Lifting

  • Year:

    2020

PACKING VOIDS AND LEVELING THE FLOOR SLABS photo_2021-05-03_14-10.jpg photo_2021-05-03_14-10-40_224x171_a6a.jpg

PACKING VOIDS AND LEVELING THE FLOOR SLABS

  • Target:

    Elimination of slab settlement consequences

  • Location:

    Kherson region, Ukraine

  • Technology:

    Deep Lifting & Floor Lifting

  • Year:

    2021

FLOOR REPAIR OF THE FINISHED PRODUCTS WAREHOUSE OF A/T TOBACCO COMPANY «V.A.T.-PRYLUKY» PrJSC PRYLUKY

FLOOR REPAIR OF THE FINISHED PRODUCTS WAREHOUSE OF A/T TOBACCO COMPANY «V.A.T.-PRYLUKY» PrJSC

  • Target:

    Soil stabilization of the floor base, lifting the floor slab

  • Location:

    Kyiv, Ukraine

  • Technology:

    Deep Lifting & Floor Lifting

  • Year:

    2019

ALL WORK USING GEORESIN TECHNOLOGY IS CARRIED OUT:

  • 01 In the presence of the customer
  • 02 On a local site without excavation and earthworks
  • 03 Without dismantling equipment and stopping technological processes
  • 04 At any time of the day and under any weather conditions
  • 05 Fast, silent, without waste and garbage
  • 06 Warranty obligations include not only the absence of subsidence and destruction, but on individual projects it is possible to return everything to the constructive design position
video